Contact Us




Grove Park Primary School in Hillingdon contacted Fix My Shelter after their existing bike shelters showed signs of aging, with dull or damaged Perspex panels and worn framework paintwork. The school needed a practical, durable, and cost-effective refurbishment, restoring the shelters to a safe, attractive condition without the expense of full replacement.

After conducting a site assessment, Fix My Shelter supplied and installed new clear impact-resistant glazing panels and fully refurbished the shelter framework with a fresh protective repaint. The result is a clean, modern, and long-lasting upgrade that has significantly improved both the appearance and safety of the school’s outdoor areas.

Client Overview

Client Name: Grove Park Primary School
Sector/Industry: Education (Primary School)
Location: Hillingdon, UK
Type of Site: Primary school playground with high daily staff and pupil footfall
Relevant Context: Multiple bike shelters used daily for pupil bike parking and school community travel initiatives

The Results

The refurbished bike shelters were transformed, delivering:

  • Clear, modern-looking glazing panels that significantly improve visibility
  • A fully refreshed, professionally repainted framework
  • Improved weather protection for bikes and pupils
  • Enhanced safety with brand-new impact-resistant panels
  • Extended lifespan of the shelters without replacement costs
  • A more attractive outdoor environment for pupils and staff

Additional achievements:

Lower long-term maintenance needs

Quick resolution of under-measured panels without disruption

Professional finish that revitalised a high-footfall area

A cost-effective upgrade compared to full shelter replacement

Before

After

Project Summary

ClientTeesside NHS Trust
LocationMiddlesborough & York
SectorHealthcare 
Project TypeBike Shelter Glazing Panel Replacement
Disruption LevelMinimal
Project Duration2 Days
Completion On Time?Yes

Key Takeaways

  • Fast, professional refurbishment without replacing full shelters
  • Clear new glazing significantly improved visibility and safety
  • Repainting extended the shelter’s lifespan by 8–10 years
  • Issue with measurements resolved quickly and professionally
  • Excellent communication ensured a smooth project from start to finish

Why Refurbishment Instead of Replacement?


Choosing refurbishment allowed Grove Park Primary to:

  • Reduce capital expenditure
  • Avoid site groundwork and installation disruption
  • Extend lifespan of existing structures
  • Improve sustainability by reusing existing steelwork
  • Achieve a high-quality finish in a shorter timeframe


Need to Repair or Refurbish Your Shelter?

If your organisation has ageing or damaged shelter glazing panels, Fix My Shelter provides fast, reliable refurbishment services that restore safety, protection, and appearance without the cost of full replacement.

Contact our team today for a free site assessment and quotation.