Barnwell High School in Stevenage contacted Fix My Shelter after their existing cycle shelter had become visibly weathered due to years of exposure to the elements. The shelter framework had faded significantly, along with ageing glazing panels that had deteriorated, reducing both the visual appearance and effectiveness of the structure.

As the cycle shelter is used daily by pupils and staff, the school required a cost-effective refurbishment solution that would restore the shelter’s appearance, improve weather protection and extend the lifespan of the existing asset without the expense of a complete replacement.

Following a site survey, Fix My Shelter recommended a full refurbishment programme including professional recoating of the existing shelter framework and the installation of new glazing panels. The completed works transformed the appearance of the shelter and provided a durable, long-term solution for the school.

Client Overview

Client Name: Barnwell High School
Sector/Industry: Education (Secondary School)
Location: Stevenage, UK
Type of Site: School campus with dedicated cycle parking facilities
Relevant Context: Existing cycle shelter used daily by pupils and staff for bicycle storage and protection from the weather.

The Results

The refurbishment transformed the existing cycle shelter, delivering:

  • Refreshed appearance of the cycle shelter area
  • Improved weather protection for bicycles and users
  • Extended lifespan of the existing shelter structure
  • Reduced future maintenance requirements
  • Enhanced environment for pupils and staff

Additional Improvements:

  • Modernised appearance of a key outdoor facility
  • Protective coating helps reduce future deterioration
  • Improved presentation of the school’s cycling facilities
  • Cost savings compared with complete shelter replacement

The project successfully restored the shelter to a high standard while helping Barnwell High School maximise the value of its existing infrastructure. 

Before

shelter needing restoring

After

shelter after restoration

Project Summary

ClientBarnwell High School
LocationStevenage, UK
SectorEducation
Project TypeBike Shelter Refurbishment
Disruption LevelMinimal
Project Duration4 Days
Completion On Time?Yes

Key Takeaways

  • Refurbishment extended the lifespan of the existing shelter and avoided replacement costs.
  • Professional recoating restored the framework and improved long-term durability.
  • New glazing panels enhanced both appearance and weather protection.
  • The project delivered a significant visual improvement to a key pupil facility.
  • Works were completed efficiently and on schedule with minimal disruption.

Why Refurbishment Instead of Replacement?


Refurbishing the existing cycle shelter allowed Barnwell High School to:

  • Reduce capital expenditure
  • Extend the life of an existing asset
  • Improve sustainability by reusing the existing structure
  • Avoid unnecessary removal and replacement works
  • Achieve a faster project turnaround
  • Improve appearance and performance at a fraction of replacement costs


Need to Repair or Refurbish Your Shelter?

If your organisation has ageing or damaged shelter glazing panels, Fix My Shelter provides fast, reliable refurbishment services that restore safety, protection, and appearance without the cost of full replacement.

Contact our team today for a free site assessment and quotation.

Back to all case studies

Bike Shelter Refurbishment for Marks & Spencer


bike shelter in need of refurbishment
M&S bike shelter after refurbishment

Bike Shelter Glazing Panel Replacement – Teesside NHS Trust


NHS cycle shelter before refurbishment
NHS cycle shelter after refurbishment

Cycle Shelter Refurbishment at Ridgeway Education Trust


upscaled images for ridgeway_00000
upscaled images for ridgeway_00005

Bike Shelter Glazing Replacement at Swakeleys School for Girls


large bike compound in need of glazing panel replacement
large bike compound refurbished